loader

Update of Golden 1 Center – Trusses – Drone Photography Construction May 26, 2016

Image In Flight is providing the drone photography construction images for the Golden 1 Center. That means we get to show you sneak peeks of all of the Golden 1 Center action.

Here is an August update of the Golden 1 center.

Watch the drone surveying the golden 1 center as it shows off the first set of giant steel trusses being installed in the building.

Image in Flight has been fortunate enough to be the “Drone Cam” for the Golden 1 Center since June of 2015.  We captured all of the progress from the erection of the structural steel to the pouring of the actual court floor.  The G1C (Golden 1 Center) is at the heart of the revitalization of downtown Sacramento.  

What is Golden 1 Center:

This is a rendering of the new interior of the Golden 1 center. Photo courtesy of http://www.sactownroyalty.com/2015/6/16/8789239/golden-1-center-new-home-of-the-sacramento-kings

This is a rendering of the new interior of the Golden 1 center. Photo courtesy of http://www.sactownroyalty.com/2015/6/16/8789239/golden-1-center-new-home-of-the-sacramento-kings

The project encompasses four city blocks right in the heart of downtown that will be a major catalyst for development in the surrounding area and in the entire region. The arena itself is an indoor multi-use facility that will accommodate sporting and top entertainment events such as professional and collegiate sports, concerts, ice shows, indoor rodeo, trade shows, large graduations, family shows, and other indoor entertainment. It also contains a state of the art practice facility with administrative offices.

The project also includes up to 1.5 million square feet of additional development including 475,000 square feet of office space, 350,000 square feet of retail, a 250-room hotel, and up to 500,000 square feet for residential units. The first phase of the project includes over 715,000 square feet of development, over 300,000 square feet of retail, 128,000 square feet of office, a 250-room hotel and up to 50 residential units.

Some fun facts about the Golden 1 Center:

  1. The total cost of Golden 1 Center is estimated to be $507 million.
  2. The arena’s capacity for NBA games is 17,500.
  3. It is estimated that 10 to 15 percent of visitors will walk, bike or take public transportation to Golden 1 Center events.
  4. More than 13,500 parking spaces exist within 1/2 mile of Golden 1 Center.
  5. A study estimates that Golden 1 Center alone will attract 1.6 million new visitors to downtown Sacramento each year.
    1. These new visitors are a major contributor to the $11.5B in estimated positive economic impact that will result from the new Golden 1 Center over 35 years.

Here is a link to events that are coming to the Golden 1 Center – http://www.ticketmaster.com/Golden-1-Center-tickets-Sacramento/venue/229976

Have questions about the Golden 1 Center, check out this link – http://www.golden1center.com/faqs/

Heather Emerson-Smith

0

Leave a Reply

All Rights Reserved to Image in Flight, LLC 2017 | Website by Local Reach Branding

Workmode Certified PilotWorkmode Certified PilotDrone Company 2016Section 333 Exemption 2016Thumbtack Spotlight